5 – Odds and Ends

The last couple of weeks has been filled with lots of small jobs waiting for the plumber and electrician. And we both had the flu so didn’t feel like doing much. But jobs had to be done as everything needs to be ready for the plasterer who is coming on the 30th of Jan.

Laid laminate in preparation for the new cupboard
Tracing pipes. Had to lift so many floorboards
Radiator off to reveal the old wallpaper
Kitchen door.
Not a door anymore
Round the back ready for a sheet of plasterboard
Plasterboard and switch box in place
Dot and dab adhesive to stick plasterboard over where the wall was removed. It’s the stickiest substance known to man
Added frame ready for studwall. Can’t finish until the electricians have done their thing.
But the plasterboard has gone
So we can now get into the garage

At the same time:

The sparky has been busy preparing for the new consumer unit
And the plumber has been plumbing so the flat now has independent heating.

Back to the renovations page

Add a comment
Your name
Your email